+7 (495) 777 2626
Ask a Question

Projects

Mining Industry

VERYSELL PROJECT TIMELINE: 2001-2016:

Telecommunications

Year

Customer

Name of works (services)

1.

2010

Metalloinvest

Development of service-based IT management standards at 4 holding facilities

2.

2010

Wimm-Bill-Dann

Setup of IT infrastructure management processes

3.

2010

Absolut Bank

Development of IT service management concept

4.

2010

TransCredit Bank

Audit of server equipment and information system infrastructure

5.

2010

NADYMGAZPROM

Implementation of R/3 enterprise level system by SAP AG

6.

2010

Сhernogorneft

Setup of the corporate information system; implementation of R/3 enterprise level system by SAP AG

7.

2010

Aeroflot Airlines

Feasibility study, selection and deployment of the finance management system

8.

2010

Sheremetyevo International Airport

Feasibility study, selection and deployment of a procurement, finance and human resource management and controlling.

9.

2010

Rostelecom

ITSM implementation with regard to service level and incident management. Subscription-based maintenance of the IS change management system.

10.

2010

MIEL Reality

Implementation of incident management process; support service automation

11.

2010

Sun Interbrew

ITSM implementation with regard to incident management; support service automation

12.

2010

Sovintel ISP

Implementation of the management and monitoring system for PC & software stocktaking, updating, user support, server operation control (availability, performance, timely detection and handling of issues

13.

2010

Auchan

Development and implementation of the system to record and analyse employee working time

14.

2010

Petrocommerce Bank

Modernization of data processing center: disaster-proof configuration, development and implementation of a mechanism replicating data between platforms, consolidation of the bank server resources, setup of the bank storage network

15.

2013

MGTS

Fiber-optic communication line set up for a backbone network

Security in Public Sector

Year

Customer

Name of works (services)

1.

2007

Interior Ministry Administration, Chelyabinsk

Safe City Suite (deployment of the city fire alarm system at landmark video-monitoring posts of M-5 Ural highway).

2.

2008

Interior Ministry Administration, Khanty-Mansiysk

Safe City Suite (deployment of the city video-monitoring system)

3.

2008

City Interior Ministry Administration, Yekaterinburg

Safe City Suite (deployment of the city video-monitoring system)

4.

2009

Interior Ministry Administration, Pskov Region

Safe City Suite (deployment of the city video-monitoring system)

5.

2009

Leningrad Region Administration

Safe City Suite (deployment of the city video-monitoring system)

6.

2009

Interior Ministry Administration, Magnitogorsk

Safe City Suite (deployment of the city video-monitoring and event recording system)

Mining Industry

Year

Customer

Name of works (services)

1.

2001

Norilsk Nickel Mining and Metallurgy Company, Polar affiliate

Design of concept and strategy for PCS development in 2002-2012

2.

2010

ROSATOM, Argun Manufacturing, Mining and Chemicals Company

Strategy and concept for automated system development in 2010-2020. Project documentation for implementation of a supervisory system at the mining division of Argun Manufacturing, Mining and Chemicals Company.

3.

2010

Nordinvest

System development for automated analytical control over the concentrating mill

4.

2011

Bugdainsk Mining Plant

Planning for an engineering project

5.

2012

Baikal Mining Company

Design and implementation of an industrial process management system

6.

2014

Metallinvest, Lebedinsk Mining Plant

Audit to assess the need and possibility of implementing an automated analytical control system

7.

2014 - 2016

Phosagro Group Apatite Company

Development of the necessary documentation of the first stage of the project of reconstruction of core technological machinery and automating of the apatite concentrate loading point. Setup of the mobile radio system in Yuksport tunnel.

8.

2014 - 2016

Phosagro Group Apatite Company

Setup of an automated system for controlled load of apatite concentrate to railway cars at the premises of apatite-nepheline concentration plant №3 (ANOPh-3), in progress.

Metallurgy

Year

Customer

Name of works (services)

1.

2004 - 2005

OMK Group’s Vyksunsk Metallurgy Plant

Development of a MES concept for Electric-weld Pipe Facility 4. MES design for Electric-weld Pipe Facility 4.

2.

2010

Krastsvetmet

LIMS setup

3.

2010

ArselorMittal Timirtau Company

Development of technical solutions for automated recording of ferroalloys and alloying elements coming to the pneumatic steelmaking facility from the warehouse. Design of technical solutions for automated recording of cast iron in the mixing unit.

4.

2010

ArselorMittal Timirtau Company

Development of technical solutions for crane weighing and recording of liquid metal (pneumatic steelmaking, melting, and steel teeming units).

5.

2010

ArselorMittal Timirtau Company

Development of technical solutions for automatic recording and metering of materials passing through the conveying pipe (pneumatic steelmaking).

6.

2011

Cherepovets Metallurgy Plant, Severstal

Design of the Melt PCS suite for electric and pneumatic steelmaking facilities

Energy

Year

Customer

Name of works (services)

1.

2007

Rosatom, Rosenergoatom

Development of the concern’s IT concept and strategy

2.

2015

Electroset Service Company

Deployment of satellite transport navigation systems

3.

2016

AES, AES, Ust-Kamenogorsk Heat and Power Plant, AES Shulbinsks Hydroelectric Power Plant.

Implementation of the System for Core Asset Management in Kazakhstan AES Energy Complex facilities: Ust-Kamenogorsk Heat and Power Plant, AES Shulbinsks Hydroelectric Power Plant

4.

2016

Kirishskaya Regional Power Station

Concept of the power station management system

5.

2016

Federal Grid Company

Setup of a distributed failure-proof IT infrastructure

6.

2016

Cross-Regional Energy Distribution Center Holding

Setup of a high-performance IT infrastructure. Implementation of the data protection solution.

7.

2016

Urals Cross-Regional Energy Distribution System

Unified communication system setup

8.

2016

Rosatom State Corporation

Deployment of the Emergency Center

9.

2016

Moscow City Energy Supply Network Company

Setup of a multi-service network for transferring data at the top level of the automated information and metering system for commercial record-keeping.

Chemicals

Year

Customer

Name of works (services)

1.

2005 - 2006

Rosatom, TVEL, Novosibirsk Chemical Concentrates Plants OJSC

Core asset management system setup (analysis and design)

2.

2005 - 2006

Rosatom, TVEL, Novosibirsk Chemical Concentrates Plants OJSC

Implementation of the system for machinery maintenance and repairs management.

3.

2005 - 2006

Rosatom, TVEL, Novosibirsk Chemical Concentrates Plants OJSC

Working out a functional specification of a MES-class system, comparison study of available MES platforms.

Machinery and Engineering

Year

Customer

Name of works (services)

1.

2014

All-Russia Institute for Automatics (Rosatom State Company)

Setup of the cable system backbone segment using optic-fiber components by Panduit & HUBER+SUHNER. Building horizontal cable systems with Eurolan components.

Selection of criteria: