№ |
Year |
Customer |
Name of works (services) |
1. |
2010 |
Metalloinvest |
Development of service-based IT management standards at 4 holding facilities |
2. |
2010 |
Wimm-Bill-Dann |
Setup of IT infrastructure management processes |
3. |
2010 |
Absolut Bank |
Development of IT service management concept |
4. |
2010 |
TransCredit Bank |
Audit of server equipment and information system infrastructure |
5. |
2010 |
NADYMGAZPROM |
Implementation of R/3 enterprise level system by SAP AG |
6. |
2010 |
Сhernogorneft |
Setup of the corporate information system; implementation of R/3 enterprise level system by SAP AG |
7. |
2010 |
Aeroflot Airlines |
Feasibility study, selection and deployment of the finance management system |
8. |
2010 |
Sheremetyevo International Airport |
Feasibility study, selection and deployment of a procurement, finance and human resource management and controlling. |
9. |
2010 |
Rostelecom |
ITSM implementation with regard to service level and incident management. Subscription-based maintenance of the IS change management system. |
10. |
2010 |
MIEL Reality |
Implementation of incident management process; support service automation |
11. |
2010 |
Sun Interbrew |
ITSM implementation with regard to incident management; support service automation |
12. |
2010 |
Sovintel ISP |
Implementation of the management and monitoring system for PC & software stocktaking, updating, user support, server operation control (availability, performance, timely detection and handling of issues |
13. |
2010 |
Auchan |
Development and implementation of the system to record and analyse employee working time |
14. |
2010 |
Petrocommerce Bank |
Modernization of data processing center: disaster-proof configuration, development and implementation of a mechanism replicating data between platforms, consolidation of the bank server resources, setup of the bank storage network |
15. |
2013 |
MGTS |
Fiber-optic communication line set up for a backbone network |
№ |
Year |
Customer |
Name of works (services) |
1. |
2007 |
Interior Ministry Administration, Chelyabinsk |
Safe City Suite (deployment of the city fire alarm system at landmark video-monitoring posts of M-5 Ural highway). |
2. |
2008 |
Interior Ministry Administration, Khanty-Mansiysk |
Safe City Suite (deployment of the city video-monitoring system) |
3. |
2008 |
City Interior Ministry Administration, Yekaterinburg |
Safe City Suite (deployment of the city video-monitoring system) |
4. |
2009 |
Interior Ministry Administration, Pskov Region |
Safe City Suite (deployment of the city video-monitoring system) |
5. |
2009 |
Leningrad Region Administration |
Safe City Suite (deployment of the city video-monitoring system) |
6. |
2009 |
Interior Ministry Administration, Magnitogorsk |
Safe City Suite (deployment of the city video-monitoring and event recording system) |
№ |
Year |
Customer |
Name of works (services) |
1. |
2001 |
Norilsk Nickel Mining and Metallurgy Company, Polar affiliate |
Design of concept and strategy for PCS development in 2002-2012 |
2. |
2010 |
ROSATOM, Argun Manufacturing, Mining and Chemicals Company |
Strategy and concept for automated system development in 2010-2020. Project documentation for implementation of a supervisory system at the mining division of Argun Manufacturing, Mining and Chemicals Company. |
3. |
2010 |
Nordinvest |
System development for automated analytical control over the concentrating mill |
4. |
2011 |
Bugdainsk Mining Plant |
Planning for an engineering project |
5. |
2012 |
Baikal Mining Company |
Design and implementation of an industrial process management system |
6. |
2014 |
Metallinvest, Lebedinsk Mining Plant |
Audit to assess the need and possibility of implementing an automated analytical control system |
7. |
2014 - 2016 |
Phosagro Group Apatite Company |
Development of the necessary documentation of the first stage of the project of reconstruction of core technological machinery and automating of the apatite concentrate loading point. Setup of the mobile radio system in Yuksport tunnel. |
8. |
2014 - 2016 |
Phosagro Group Apatite Company |
Setup of an automated system for controlled load of apatite concentrate to railway cars at the premises of apatite-nepheline concentration plant №3 (ANOPh-3), in progress. |
№ |
Year |
Customer |
Name of works (services) |
1. |
2004 - 2005 |
OMK Group’s Vyksunsk Metallurgy Plant |
Development of a MES concept for Electric-weld Pipe Facility 4. MES design for Electric-weld Pipe Facility 4. |
2. |
2010 |
Krastsvetmet |
LIMS setup |
3. |
2010 |
ArselorMittal Timirtau Company |
Development of technical solutions for automated recording of ferroalloys and alloying elements coming to the pneumatic steelmaking facility from the warehouse. Design of technical solutions for automated recording of cast iron in the mixing unit. |
4. |
2010 |
ArselorMittal Timirtau Company |
Development of technical solutions for crane weighing and recording of liquid metal (pneumatic steelmaking, melting, and steel teeming units). |
5. |
2010 |
ArselorMittal Timirtau Company |
Development of technical solutions for automatic recording and metering of materials passing through the conveying pipe (pneumatic steelmaking). |
6. |
2011 |
Cherepovets Metallurgy Plant, Severstal |
Design of the Melt PCS suite for electric and pneumatic steelmaking facilities |
№ |
Year |
Customer |
Name of works (services) |
1. |
2007 |
Rosatom, Rosenergoatom |
Development of the concern’s IT concept and strategy |
2. |
2015 |
Electroset Service Company |
Deployment of satellite transport navigation systems |
3. |
2016 |
AES, AES, Ust-Kamenogorsk Heat and Power Plant, AES Shulbinsks Hydroelectric Power Plant. |
Implementation of the System for Core Asset Management in Kazakhstan AES Energy Complex facilities: Ust-Kamenogorsk Heat and Power Plant, AES Shulbinsks Hydroelectric Power Plant |
4. |
2016 |
Kirishskaya Regional Power Station |
Concept of the power station management system |
5. |
2016 |
Federal Grid Company |
Setup of a distributed failure-proof IT infrastructure |
6. |
2016 |
Cross-Regional Energy Distribution Center Holding |
Setup of a high-performance IT infrastructure. Implementation of the data protection solution. |
7. |
2016 |
Urals Cross-Regional Energy Distribution System |
Unified communication system setup |
8. |
2016 |
Rosatom State Corporation |
Deployment of the Emergency Center |
9. |
2016 |
Moscow City Energy Supply Network Company |
Setup of a multi-service network for transferring data at the top level of the automated information and metering system for commercial record-keeping. |
№ |
Year |
Customer |
Name of works (services) |
1. |
2005 - 2006 |
Rosatom, TVEL, Novosibirsk Chemical Concentrates Plants OJSC |
Core asset management system setup (analysis and design) |
2. |
2005 - 2006 |
Rosatom, TVEL, Novosibirsk Chemical Concentrates Plants OJSC |
Implementation of the system for machinery maintenance and repairs management. |
3. |
2005 - 2006 |
Rosatom, TVEL, Novosibirsk Chemical Concentrates Plants OJSC |
Working out a functional specification of a MES-class system, comparison study of available MES platforms. |
№ |
Year |
Customer |
Name of works (services) |
1. |
2014 |
All-Russia Institute for Automatics (Rosatom State Company) |
Setup of the cable system backbone segment using optic-fiber components by Panduit & HUBER+SUHNER. Building horizontal cable systems with Eurolan components. |